Skip to main content
VCSLivestock, enteric fermentation, and manure managementUnited States Registry: RegisteredAMS-III.Y

Royal Dairy Solid Separation Enhanced by Vermicomposting

VCS-2259 ↗

#275of 1329 in Industrial#150of 389 in United States#480of 1339 in Verra (VCS)

5.4/ 10
Integrity
5.5
Transparency
5.5
Claim Safety
5.0
Documentation
5.5

Audit Analysis

The Royal Dairy Solid Separation project has a VVB-confirmed barrier additionality test and no reported reversal events, but suffers from a project-specific baseline, an unaddressed 0% leakage deduction, and no stated buffer pool. Eleven corrective action requests during verification indicate significant initial data-quality gaps, though all were resolved. The project delivered exactly its claimed emissions reductions for the 2024 monitoring period, but the absence of a lifetime ex-ante estimate prevents a full over-crediting assessment.

Red Flags

  • Leakage deduction of 0% with justification listed as 'not addressed' in the 2025 verification report, despite the 2024 report having stated it was 'quantified' — a regression in documentation quality
  • No buffer pool percentage stated for a manure-management project with inherent reversal risk (degradation of vermicompost or re-methanation)
  • Eleven corrective action requests raised during the 2025 verification cycle, including discrepancies in herd counts, missing fossil-fuel calculations, and parameter deviations, indicating fragile data management
  • Baseline is project-specific with no documented reassessment date, and the 2025 monitoring report describes the baseline as 'mixed' (measured and modeled) while an earlier 2025 report described it as purely 'modeled'

Credit Vintages

IssuedRetiredAvailable
2020
25,68025,6800
2021
34,75934,7590
2022
39,17439,1740
2023
52,78852,600188
2024
49,67349,6730
Total202,074201,886188

Risk Indicators

Additionality

VVB-confirmed barrier test

Permanence

no reversals

Leakage

0% deduction, justification not addressed

Baseline

Project-specific, no reassessment date

Safeguards

Grievance present, FPIC not conducted

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03AMS-III.Y

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents