Safe Water Programme – Kenya – VPA 31

GS-3310 ↗ · current registry ID: GS11289

#185of 1329 in Industrial#19of 157 in Kenya#330of 1801 in Gold Standard (GS)

5.6/ 10
Integrity
5.5
Transparency
6.0
Claim Safety
5.5
Documentation
5.5

Audit Analysis

The Safe Water Programme in Kenya demonstrates a verified additionality case and consistent claimed/verified ERR figures, but is undermined by a project-specific baseline, an unaddressed leakage justification, absence of a buffer pool, and a substantial list of 17 corrective actions. The lack of an ex-ante lifetime estimate prevents a meaningful pro-rata delivery check, and several contradictions across verification and monitoring reports reduce confidence in data reliability.

Red Flags

  • Leakage deduction of 0% with justification recorded as 'not addressed' in the 2024 verification report, contradicting an earlier 'deemed negligible' statement — no quantified or qualitatively justified treatment of leakage for a project where users may revert to previous water sources
  • No buffer pool or permanence mechanism identified in any available document, leaving reversal risk (e.g., system disuse or breakdown) unmitigated
  • 17 corrective actions required by the VVB, including sampling design non-compliance with CDM Appendix 3, missing deviation documentation, and incomplete safeguard reporting — indicating material MRV and governance gaps
  • No ex-ante lifetime ERR estimate found in the extracted record, making it impossible to assess whether the 1,023,164 tCO₂e claimed for the December 2024 monitoring period is proportionate to the 5-year crediting period

Credit Vintages

IssuedRetiredAvailable
2021
49,12649,1260
2022
41,24326,19115,052
2023
38,203038,203
2024
53,060053,060
Total181,63275,317106,315

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

no reversal events but no mitigation mechanism

Leakage

0% deduction; justification 'not addressed' in 2024 VR

Baseline

Project-specific; no reassessment date stated

Safeguards

Grievance mechanism and benefit sharing present; FPIC not stated; corrective actions on safeguard reporting

Double-claim

CORSIA and CCP status both not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-06General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.