Skip to main content
GSEnergy Efficiency - DomesticKenyaGeneral Methodologyv2.1

Safe Water Programme – Kenya – VPA 36

GS-3315 ↗ · current registry ID: GS11294

#795of 1329 in Industrial#95of 157 in Kenya#1187of 1801 in Gold Standard (GS)

4.7/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
5.0
Documentation
4.0

Audit Analysis

The Safe Water Programme in Kenya has a confirmed investment-test additionality and a verified usage rate exceeding the ex-ante assumption, but is undermined by a material finding that actual emission reductions fall below the registered PDD estimates, a 0% leakage deduction with no supporting justification, the absence of a buffer pool, and 24 outstanding corrective actions. Multiple contradictions across verification reports reduce confidence in the data record.

Red Flags

  • Material finding in the 2024 verification report states actual emission reductions are lower than ex-ante estimates in the registered PDD
  • Leakage deduction of 0% with justification recorded as 'not addressed' in the most recent verification report (2024-09-21)
  • 24 corrective actions remain open, including sampling-design non-compliance with CDM Guideline Appendix 3 and potential systemic bias in chlorine tablet usage
  • Contradiction in FNRB method between 'national_default' (2024 VR) and 'local_field' (2022 document) raises questions about which emission factor underpins the credit calculation

Credit Vintages

IssuedRetiredAvailable
2021
58,08553,5634,522
2022
49,66223,34226,320
2023
47,567047,567
2024
59,686059,686
Total215,00076,905138,095

Risk Indicators

Additionality

Investment test VVB-confirmed

Permanence

no reversals reported

Leakage

0% deduction, justification not addressed

Baseline

Project-specific; no reassessment date

Safeguards

Grievance & benefit-sharing present; FPIC not stated

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-06General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents