The Safe Water Programme in Kenya has a confirmed investment-test additionality and a named VVB, but is undermined by a material finding that actual emission reductions fall below the original PDD estimates, an unaddressed 0% leakage deduction, and 24 outstanding corrective actions spanning sampling methodology, operational-day calculations, and bias risks in chlorine tablet usage. Multiple contradictions between verification reports (2023 vs. 2024) on leakage justification, FNRB method, and ERR figures further erode confidence in the data chain.

Red Flags

  • Material finding in the 2024 verification report explicitly states actual emission reductions are lower than ex-ante estimates in the registered PDD, indicating the original credit volume was over-optimistic.
  • Leakage deduction is 0% with justification recorded as 'not addressed' in the most recent verification report (2024-09-21), a significant gap for a distributed water-supply project where users may revert to unsafe sources.
  • 24 corrective actions remain open, including requirements to fix stratified random sampling to meet CDM Appendix 3, eliminate potential systemic bias in chlorine tablet usage, and justify operational-day assumptions with evidence.
  • Contradiction in total ERR figures between the October 2023 verification report (362,022) and the September 2024 verification report (1,023,164) is unexplained in the extracted record, raising questions about whether the higher figure is cumulative or a revised single-period value.

Credit Vintages

IssuedRetiredAvailable
2021
57,35057,3500
2022
49,12848,147981
2023
49,734049,734
2024
53,930053,930
Total210,142105,497104,645

Risk Indicators

Additionality

Investment test VVB-confirmed

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, justification not addressed

Baseline

Project-specific, no reassessment date

Safeguards

Mentioned but FPIC not confirmed; grievance mechanism present

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-06General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents