Skip to main content
GSEnergy Efficiency - DomesticKenyaGeneral Methodologyv2.1

Safe Water Programme – Kenya – VPA 43

GS-3322 ↗ · current registry ID: GS11301

#987of 1329 in Industrial#124of 157 in Kenya#1416of 1801 in Gold Standard (GS)

4.4/ 10
Integrity
4.5
Transparency
4.0
Claim Safety
4.5
Documentation
4.5

Audit Analysis

The Safe Water Programme in Kenya has a VVB-confirmed investment additionality test and conservative usage assumptions, but is undermined by an unaddressed 0% leakage deduction, a project-specific baseline with no documented reassessment, no buffer pool, and 24 outstanding corrective actions. The identical claimed and verified ERR figures (1,023,164 tCO₂e) raise concerns about verification independence, while multiple contradictions across monitoring and verification reports weaken data reliability.

Red Flags

  • Claimed and verified ERR are identical (1,023,164 tCO₂e) in the 2024 verification report, suggesting the VVB may have rubber-stamped the project's own calculation rather than independently verifying it.
  • Leakage deduction is 0% with justification recorded as 'not addressed' in the 2024 verification report, despite a safe-water project carrying inherent risk of users reverting to unsafe water sources.
  • 24 corrective actions remain outstanding, including concerns about systemic bias in chlorine tablet usage potentially leading to overestimation of emission reductions.
  • No buffer pool percentage is stated in any available document, leaving no quantified safeguard against potential reversal of water-supply benefits.
  • The material finding explicitly states that actual emission reductions are lower than ex-ante estimates in the registered PDD, yet the verified figure equals the claimed figure exactly.

Credit Vintages

IssuedRetiredAvailable
2021
49,73549,7350
2022
40,298040,298
2023
41,532041,532
2024
59,753059,753
Total191,31849,735141,583

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

avoidance-type project

Leakage

0% deduction, justification not addressed

Baseline

Project-specific; no reassessment date stated

Safeguards

Mentioned and grievance mechanism present; FPIC not confirmed

Double-claim

CCP and CORSIA status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-06General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents