GSEnergy Efficiency - DomesticKenyaGeneral Methodologyv2.1

Safe Water Programme – Kenya – VPA 44

GS-3323 ↗ · current registry ID: GS11302

#796of 1329 in Industrial#96of 157 in Kenya#1188of 1801 in Gold Standard (GS)

4.7/ 10
Integrity
4.5
Transparency
5.5
Claim Safety
4.5
Documentation
4.0

Audit Analysis

The Safe Water Programme in Kenya has a VVB-confirmed investment additionality test and a named verification body, but is undermined by a material finding that verified emission reductions fall below ex-ante estimates, a 0% leakage deduction with no documented justification, and 23 outstanding corrective actions. Multiple contradictions across verification reports raise data-reliability concerns, and the absence of a buffer pool or documented permanence mechanism leaves the project exposed to reversal risk.

Red Flags

  • Material finding in the 2024 verification report states actual emission reductions are lower than ex-ante estimates in the registered PDD, indicating potential over-crediting in earlier periods.
  • Leakage deduction is 0% with justification recorded as 'not addressed' in the most recent (2024) verification report, contradicting an earlier 'deemed negligible' statement — no quantitative or qualitative leakage analysis is documented.
  • 23 corrective actions remain open, including errors in monitoring report dates, sampling design non-compliance with CDM Appendix 3, and missing evidence for operational-day calculations.
  • No buffer pool percentage or permanence mechanism is stated in any available document, leaving reversal risk unmitigated.
  • FPIC (Free, Prior and Informed Consent) is not documented in the extracted record despite the project serving schools and communities in Kenya.

Credit Vintages

IssuedRetiredAvailable
2021
54,63354,6330
2022
44,455044,455
2023
41,620041,620
2024
54,257054,257
Total194,96554,633140,332

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, justification 'not addressed'

Baseline

Project-specific, no reassessment date stated

Safeguards

Grievance mechanism present, FPIC not documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-06General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents