Safe Water Programme – Kenya – VPA 47
GS-3326 ↗ · current registry ID: GS11305
#392of 1329 in Industrial#45of 157 in Kenya#632of 1801 in Gold Standard (GS)
Audit Analysis
The Safe Water Programme in Kenya has a VVB-confirmed investment additionality test and no reported reversal events, but suffers from a 0% leakage deduction with no justification in the most recent verification report, absence of a buffer pool, and a project-specific baseline. Seventeen corrective actions and multiple inter-document contradictions (leakage treatment, FNRB method, ERR figures) indicate meaningful data-quality and reporting gaps that temper confidence in the claimed reductions.
Red Flags
- Leakage deduction of 0% with justification recorded as 'not addressed' in the September 2024 verification report, despite an earlier (April 2023) report stating it was 'deemed negligible' — the project type (safe water supply) carries inherent leakage risk if households revert to boiling water
- Seventeen corrective actions required by the VVB, including sampling design non-compliance with CDM Appendix 3, missing deviation documentation, and incomplete safeguard reporting
- FNRB method contradicted between the verification report (national default) and the monitoring report (local field), creating uncertainty about which emission factor underpins the credit calculation
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 14,363 | 14,363 | 0 | |
| 2022 | 14,896 | 0 | 14,896 | |
| 2023 | 15,312 | 0 | 15,312 | |
| 2024 | 16,666 | 0 | 16,666 | |
| Total | 61,237 | 14,363 | 46,874 |
Risk Indicators
VVB-confirmed investment test
no reversals yet
0% deduction, justification not addressed
Project-specific; reassessment date not stated
Grievance & benefit sharing present; FPIC not stated; 17 CAs
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →