The Safe Water Programme in Kenya has a VVB-verified combined additionality test and a reasonable monitoring framework, but is undermined by a major discrepancy between the ex-ante lifetime estimate (298,090 tCO₂e) and the verified figure for a single 11-month period (1,023,164 tCO₂e), a leakage deduction of 0% that is not properly justified, and eight or more corrective actions still open. The project's data reliability is significantly weakened by these contradictions and the material finding that actual emission reductions are lower than ex-ante estimates, which is inconsistent with the reported figures.

Red Flags

  • The verified emission reduction figure of 1,023,164 tCO₂e for an 11-month monitoring period is approximately 3.4 times the entire ex-ante lifetime estimate of 298,090 tCO₂e, yet the verification report's material findings state that actual ERs are lower than ex-ante estimates — an internal contradiction that undermines confidence in the reported numbers.
  • Leakage deduction is 0% with the justification recorded as 'not addressed' in the verification report, while the monitoring report claims it was 'deemed negligible' — the two documents disagree and neither provides a quantitative or methodological basis.
  • Eight or more corrective actions remain open, including requirements to fix sampling methodology, justify monitoring gaps, address potential overestimation from chlorine tablet usage, and collect missing population confirmation letters from institutions.

Credit Vintages

IssuedRetiredAvailable
2023
37,82837,8280
2024
41,919041,919
Total79,74737,82841,919

Risk Indicators

Additionality

VVB-verified combined test

Permanence

no reversal events recorded

Leakage

0% deduction, justification inconsistent across documents

Baseline

Project-specific baseline; no reassessment date found

Safeguards

Grievance mechanism and benefit sharing present; FPIC not conducted; safeguarding assessment incomplete

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-06General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents