Safe Water Programme – Kenya - VPA 51
GS-4227 ↗ · current registry ID: GS12253
#276of 1329 in Industrial#28of 157 in Kenya#453of 1801 in Gold Standard (GS)
Audit Analysis
The Safe Water Programme in Kenya is a Gold Standard project with VVB-confirmed additionality and no reported reversal events, but it carries notable weaknesses: a 0% leakage deduction with no substantive justification, a project-specific baseline with no documented reassessment, and six outstanding corrective actions related to sampling, monitoring gaps, and potential overestimation of chlorine tablet usage. The identical claimed and verified ERR figures (1,023,164) alongside a material finding that actual reductions are lower than ex-ante PDD estimates create a credibility gap that warrants caution.
Red Flags
- Leakage deduction of 0% with justification recorded as 'not addressed' in the verification report, contradicting the monitoring report's claim of 'deemed negligible' — no quantitative or qualitative leakage analysis is documented
- Six corrective actions remain open, including ensuring stratified random sampling meets CDM Guideline Appendix 3, justifying monitoring gaps, and addressing potential systemic bias in chlorine tablet usage that could lead to overestimation
- Material finding states actual emission reductions are lower than ex-ante estimates in the registered PDD, yet the verified ERR equals the claimed ERR (1,023,164), creating an unexplained discrepancy
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 34,723 | 33,365 | 1,358 | |
| 2024 | 49,793 | 0 | 49,793 | |
| Total | 84,516 | 33,365 | 51,151 |
Risk Indicators
VVB-confirmed combined test
no reversals
0% deduction, justification not addressed
Project-specific, no reassessment date
Grievance mechanism present; FPIC not stated; CAR open
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →