Safe Water Programme – Kenya - VPA 52
GS-4226 ↗ · current registry ID: GS12254
#557of 1329 in Industrial#61of 157 in Kenya#868of 1801 in Gold Standard (GS)
Audit Analysis
The Safe Water Programme in Kenya is a Gold Standard project with VVB-confirmed additionality and a verified usage rate of 96.25%, but it carries notable integrity and claim-safety concerns: a 0% leakage deduction that the verification report explicitly marks as 'not addressed,' six outstanding corrective actions including a flagged overestimation risk from chlorine tablet usage bias, and the absence of any stated buffer pool. The verified emission reductions (1,023,164 tCO₂e) are confirmed to be lower than the original PDD ex-ante estimates, which is a conservative signal, but the methodological gaps identified by the VVB undermine confidence in the robustness of the credit quantity.
Red Flags
- Verification report (2024-09-21) records the leakage justification as 'not addressed' while the monitoring report (2024-09-19) claims it was 'deemed negligible' — the 0% leakage deduction lacks a defensible basis
- Six corrective actions remain open, including a specific flag that chlorine tablet usage may introduce systemic bias leading to overestimation of emission reductions
- The assumed usage rate is not stated in any available document; only the verified rate of 0.9625 is recorded
- Pending documents (WPS lifespan declaration, voluntary action confirmation, institutional agreements) were not provided at verification
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 32,199 | 32,199 | 0 | |
| 2024 | 49,795 | 0 | 49,795 | |
| Total | 81,994 | 32,199 | 49,795 |
Risk Indicators
VVB-confirmed combined test
low inherent reversal risk
0% deduction, justification not addressed
Project-specific, no reassessment date
Grievance mechanism present; assessment update pending
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →