Safe Water Programme – Kenya - VPA 55
GS-4232 ↗ · current registry ID: GS12257
#558of 1329 in Industrial#62of 157 in Kenya#869of 1801 in Gold Standard (GS)
Audit Analysis
The Safe Water Programme in Kenya has a VVB-confirmed additionality assessment and a basic MRV framework in place, but is undermined by a material finding that actual emission reductions fall below ex-ante estimates, a contradictory and ultimately unaddressed leakage justification, six outstanding corrective actions, and the absence of any stated buffer pool or permanence mechanism. The project's claim safety is further weakened by the lack of a lifetime ex-ante figure against which to benchmark the verified 1,023,164 tCO₂e for the 11-month monitoring period.
Red Flags
- Material finding in the verification report states actual emission reductions are lower than ex-ante estimates in the registered PDD, signalling potential over-crediting in the original registration.
- Leakage justification is contradictory: the verification report (2024-09-21) records it as 'not addressed' while the monitoring report (2024-09-19) claims it is 'deemed negligible'; the VVB's own assessment prevails, leaving the 0% deduction without a defensible basis.
- Six corrective actions remain open, including stratified random sampling compliance, justification of monitoring gaps, and collection of signed population confirmation letters from each institution.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 25,710 | 5,790 | 19,920 | |
| 2024 | 53,528 | 2,472 | 51,056 | |
| Total | 79,238 | 8,262 | 70,976 |
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
0% deduction, justification contradictory/unaddressed
Project-specific baseline, no reassessment date stated
Grievance mechanism and benefit sharing present, but safeguarding assessment update required
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →