Safe Water Programme – Kenya - VPA 56
GS-4234 ↗ · current registry ID: GS12258
#323of 1329 in Industrial#34of 157 in Kenya#531of 1801 in Gold Standard (GS)
Audit Analysis
The Safe Water Programme in Kenya has VVB-confirmed additionality and a named verification body, but suffers from a project-specific baseline with no stated reassessment date, a 0% leakage deduction whose justification is contradictory across documents, and a material finding that actual emission reductions fall below ex-ante estimates. The absence of a buffer pool, combined with six outstanding corrective actions on monitoring methodology, leaves meaningful gaps in permanence and over-crediting safeguards.
Red Flags
- Material finding in the verification report states actual emission reductions are lower than ex-ante estimates in the registered PDD, yet the verified figure (1,023,164) exactly matches the claimed figure, raising questions about whether the verification independently recalculated reductions.
- Leakage deduction is 0% with the verification report recording the justification as 'not addressed,' while the monitoring report claims it was 'deemed negligible' — a direct contradiction that weakens the leakage treatment.
- Six corrective actions remain open, including requirements to justify monitoring gaps, eliminate potential bias in chlorine tablet usage, and collect signed population confirmations from each institution.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 16,029 | 12,279 | 3,750 | |
| 2024 | 37,036 | 0 | 37,036 | |
| Total | 53,065 | 12,279 | 40,786 |
Risk Indicators
VVB-confirmed combined test
no reversal events reported
0% deduction; justification contradictory across documents
Project-specific; no reassessment date stated
Grievance mechanism present; FPIC not stated; CAR on safeguarding assessment
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →