Safe Water Programme – Kenya - VPA 57
GS-4218 ↗ · current registry ID: GS12259
#391of 1329 in Industrial#44of 157 in Kenya#631of 1801 in Gold Standard (GS)
Audit Analysis
The Safe Water Programme in Kenya has a VVB-verified investment additionality test and no reversal events, but is undermined by a material finding that actual emission reductions fall below ex-ante estimates, a 0% leakage deduction whose justification is absent in the verification report, and the absence of any buffer pool. The exact match between claimed and verified ERR figures (1,023,164 tCO₂e) despite the stated under-delivery raises serious questions about the integrity of the verification arithmetic. Six corrective actions remain open, signalling unresolved MRV and documentation gaps.
Red Flags
- Material finding in the verification report states actual emission reductions are lower than ex-ante PDD estimates, yet the verified ERR figure (1,023,164) is identical to the claimed figure — the under-delivery is not reflected in the verified number.
- Leakage deduction is 0% and the verification report records the justification as 'not addressed'; the monitoring report's claim of 'deemed negligible' is not corroborated by the higher-priority verification document.
- Six corrective actions remain unresolved, including stratified sampling compliance, monitoring-gap justification, and population confirmation letters — all of which affect the reliability of the verified ERR.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 14,584 | 0 | 14,584 | |
| 2024 | 42,940 | 0 | 42,940 | |
| Total | 57,524 | 0 | 57,524 |
Risk Indicators
VVB-verified investment test
no reversals but no safety margin
0% deduction; justification not addressed per verification report
Project-specific; no reassessment date found
Grievance mechanism and benefit sharing present; FPIC not stated
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →