Skip to main content
GSEnergy Efficiency - DomesticKenyaGeneral Methodologyv2.1

Safe Water Programme – Kenya - VPA 58

GS-4224 ↗ · current registry ID: GS12260

#642of 1329 in Industrial#72of 157 in Kenya#977of 1801 in Gold Standard (GS)

4.9/ 10
Integrity
5.0
Transparency
5.0
Claim Safety
4.5
Documentation
5.0

Audit Analysis

The Safe Water Programme in Kenya is a Gold Standard project with VVB-confirmed additionality and no reversal events, but it carries moderate over-crediting risk due to a project-specific baseline, a 0% leakage deduction with inadequate justification, and corrective actions flagging potential systemic bias in usage monitoring. The verification report identified that actual emission reductions are lower than the original PDD estimates, and six corrective actions remain open, indicating the MRV framework still requires strengthening.

Red Flags

  • Leakage deduction of 0% with justification recorded as 'not addressed' in the verification report, contradicting the monitoring report's claim of 'deemed negligible' — no quantitative leakage assessment is documented
  • Corrective action explicitly flags potential systemic bias in chlorine tablet usage that could lead to overestimation of emission reductions
  • No buffer pool is in place for a 5-year crediting period, leaving no financial backstop against reversal risk
  • Six corrective actions remain open, including requirements to justify monitoring gaps and collect signed population confirmation letters from each institution

Credit Vintages

IssuedRetiredAvailable
2023
15,70615,7060
2024
47,685047,685
Total63,39115,70647,685

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

no reversals reported

Leakage

0% deduction, justification not addressed

Baseline

Project-specific; no reassessment date

Safeguards

Grievance mechanism present; assessment update pending

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-06General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents