Safe Water Programme – Kenya - VPA 61
GS-4231 ↗ · current registry ID: GS12263
#158of 1329 in Industrial#14of 157 in Kenya#287of 1801 in Gold Standard (GS)
Audit Analysis
The Safe Water Programme in Kenya demonstrates a VVB-verified combined additionality test and conservative emission reduction figures (verified ERs below the original PDD estimate), but is undermined by a 0% leakage deduction with no documented justification, the absence of FPIC for a community water project, and eight outstanding corrective actions covering sampling, monitoring gaps, and safeguarding documentation. The project-specific baseline and contradictory FNRB method reporting between the validation and verification reports introduce moderate uncertainty into the credit quantity.
Red Flags
- Leakage deduction of 0% with justification recorded as 'not addressed' in the verification report (2024-09-21), meaning the VVB found no documented rationale for the zero deduction
- FPIC was not conducted despite the project serving community water users in Kenya, and a corrective action was raised to update the safeguarding principles assessment
- Eight corrective actions remain open, including stratified random sampling compliance, monitoring gap justification, and potential systemic bias in chlorine tablet usage that could overestimate reductions
- FNRB method is reported as 'national_default' in the verification report but 'local_field' in the validation report, creating uncertainty about which emission factor basis underpins the credit quantity
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 5,344 | 4,525 | 819 | |
| 2024 | 43,430 | 10,732 | 32,698 | |
| Total | 48,774 | 15,257 | 33,517 |
Risk Indicators
mixed evidence / unresolved risk
mixed evidence / unresolved risk
mixed evidence / unresolved risk
mixed evidence / unresolved risk
mixed evidence / unresolved risk
mixed evidence / unresolved risk
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →