Skip to main content
GSEnergy Efficiency - DomesticNigeriaGeneral Methodologyv2.1

Safe Water Programme – Nigeria – VPA 05

GS-3284 ↗ · current registry ID: GS11263

#1085of 1329 in Industrial#69of 79 in Nigeria#1533of 1801 in Gold Standard (GS)

4.2/ 10
Integrity
4.5
Transparency
4.0
Claim Safety
4.0
Documentation
4.0

Audit Analysis

A Gold Standard safe-water project in Nigeria with VVB-confirmed additionality but significant documentation and methodological concerns, including a 24-item corrective action list, a large FNRB discrepancy between reporting periods, and a 0% leakage deduction whose justification is contradicted across documents. The project's scope appears to blend cookstove and water activities under a water-only methodology, raising over-crediting risk.

Red Flags

  • FNRB value differs by a factor of ~85 between the 2023 verification report (0.96, local field method) and the 2024 verification report (82.3, national default), with no documented explanation for the change
  • 24 corrective actions required by the VVB, including Kenya baseline parameters appearing in a Nigerian project, parameter value errors, and sampling methodology non-compliance with CDM Appendix 3
  • Leakage deduction of 0% with contradictory justification: the 2024 verification report states leakage was 'not addressed' while the 2024 monitoring report claims it was 'deemed negligible'
  • Project name in the verification report is 'Improved Cookstove and Safe Water Programme' but the registered methodology covers only safe drinking water supply, suggesting scope beyond the approved methodology
  • Claimed and verified ERR figures are identical (1,232,137 tCO₂e) in the 2024 verification report, indicating no independent recalculation or adjustment by the VVB

Credit Vintages

IssuedRetiredAvailable
2021
52,93152,9310
2022
57,88130,17027,711
2023
50,71846,6744,044
2024
44,704044,704
Total206,234129,77576,459

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, justification contradicted across documents

Baseline

Project-specific baseline, reassessment timing not stated

Safeguards

Grievance mechanism and benefit sharing present, FPIC not stated

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-06General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents