Skip to main content
GSEnergy Efficiency - DomesticNigeriaGeneral Methodologyv2.1

Safe Water Programme – Nigeria – VPA 08

GS-3287 ↗ · current registry ID: GS11266

#852of 1329 in Industrial#53of 79 in Nigeria#1257of 1801 in Gold Standard (GS)

4.6/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
4.5
Documentation
4.5

Audit Analysis

The Safe Water Programme in Nigeria has a confirmed investment-test additionality and a verified usage rate (96.84%) that exceeds the assumed 90%, but is undermined by a project-specific baseline, contradictory leakage treatment, a dramatic FNRB method change between reporting periods, and over 20 outstanding corrective actions. The absence of a stated buffer pool, permanence claim, and lifetime ex-ante ERR figure limits confidence in the long-term integrity of the credit.

Red Flags

  • FNRB value changed from 0.96 (local field method, 2023 VR) to 82.3 (national default, 2024 VR) — a method and value shift that cannot be fully reconciled without the underlying calculation sheets
  • Leakage deduction of 0% is justified as 'deemed negligible' in the monitoring report but listed as 'not addressed' in the verification report — the two documents disagree on whether leakage was even considered
  • Over 20 corrective actions remain open, including sampling methodology non-compliance with CDM Appendix 3, potential systemic bias in chlorine tablet usage, and incorrect baseline parameters (Kenya references in a Nigerian project)

Credit Vintages

IssuedRetiredAvailable
2021
54,54954,5490
2022
54,63130,17024,461
2023
46,336046,336
2024
40,495040,495
Total196,01184,719111,292

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, justification contradictory across docs

Baseline

Project-specific, no reassessment date stated

Safeguards

Grievance mechanism present, FPIC not stated

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-06General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents