Skip to main content
GSEnergy Efficiency - DomesticNigeriaGeneral Methodologyv2.1

Safe Water Programme – Nigeria – VPA 09

GS-3288 ↗ · current registry ID: GS11267

#395of 1329 in Industrial#13of 79 in Nigeria#635of 1801 in Gold Standard (GS)

5.2/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
5.0
Documentation
5.0

Audit Analysis

The Safe Water Programme in Nigeria has a VVB-verified investment additionality test and no reported reversal events, but suffers from a 0% leakage deduction with no proper justification, a project-specific baseline, no buffer pool, and 22 corrective actions flagged by the VVB. Multiple contradictions between the 2023 and 2024 verification reports—including a significant FNRB methodological shift from local field measurement to national default—raise concerns about the robustness and consistency of the MRV framework.

Red Flags

  • Leakage deduction of 0% with justification recorded as 'not addressed' in the 2024 verification report, while the monitoring report claims it was 'deemed negligible'—no quantitative or qualitative basis is provided in the higher-priority document
  • 22 corrective actions required by the VVB, including fixing Kenya-to-Nigeria baseline parameter errors, correcting a Cb value from 4.17% to 4.71%, and addressing potential systemic bias in chlorine tablet usage that could lead to overestimation of emission reductions
  • FNRB value changed from 0.96 (local field measurement, 2023) to 82.3 (national default, 2024), representing a methodological shift that affects the magnitude of claimed reductions
  • No ex-ante lifetime emission reduction estimate found in the extracted record, preventing a proper pro-rata comparison of verified versus expected reductions

Credit Vintages

IssuedRetiredAvailable
2021
52,38652,3860
2022
51,97330,17021,803
2023
43,322043,322
2024
41,790041,790
Total189,47182,556106,915

Risk Indicators

Additionality

VVB-verified investment test

Permanence

no reversals

Leakage

0% deduction, justification not addressed

Baseline

Project-specific; reassessment timing not stated

Safeguards

Grievance and benefit sharing present; FPIC not stated

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-06General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents