Safe Water Programme – Nigeria – VPA 10
GS-3289 ↗ · current registry ID: GS11268
#732of 1329 in Industrial#41of 79 in Nigeria#1097of 1801 in Gold Standard (GS)
Audit Analysis
The Safe Water Programme in Nigeria has a confirmed investment-test additionality and a conservative verified usage rate (96.84% vs 90% assumed), but is undermined by a project-specific baseline, an unaddressed leakage justification, the absence of any buffer pool, and a verification report containing 22 corrective actions including cross-country reference errors (Kenya in a Nigerian project). The overall MRV quality is moderate with notable gaps in permanence safeguards and baseline robustness.
Red Flags
- Verification report (2024-07-25) contains references to Kenya for baseline parameters in a Nigerian project, indicating a template or copy-paste error that undermines confidence in the MRV calculations
- Leakage deduction is 0% with justification recorded as 'not addressed' in the verification report, contradicting the monitoring report's claim of 'deemed negligible' — no quantitative or qualitative leakage analysis is documented
- 22 corrective actions were required by the VVB, including wrong parameter values, incorrect dates, and sampling methodology that does not meet CDM Appendix 3 requirements
- The ex-ante lifetime ERR estimate is not found in any document, preventing a meaningful pro-rata delivery check against the 1,232,137 tCO₂e verified for the 11-month monitoring period
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 56,749 | 56,749 | 0 | |
| 2022 | 51,190 | 27,835 | 23,355 | |
| 2023 | 45,173 | 0 | 45,173 | |
| 2024 | 39,630 | 0 | 39,630 | |
| Total | 192,742 | 84,584 | 108,158 |
Risk Indicators
Investment test confirmed by VVB
no reversal events but no safeguard
0% deduction with justification 'not addressed'
Project-specific; no reassessment date documented
Grievance mechanism and benefit sharing present; FPIC not stated
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →