Skip to main content
GSEnergy Efficiency - DomesticNigeriaGeneral Methodologyv2.1

Safe Water Programme – Nigeria - VPA 100

GS-4313 ↗ · current registry ID: GS12416

#727of 1329 in Industrial#36of 79 in Nigeria#1092of 1801 in Gold Standard (GS)

4.8/ 10
Integrity
5.0
Transparency
4.5
Claim Safety
5.0
Documentation
4.5

Audit Analysis

A new Gold Standard safe water and cookstove VPA project in Nigeria with VVB-confirmed additionality but a project-specific baseline, no buffer pool, and FPIC not conducted. Six corrective actions and three material findings in the validation report indicate unresolved documentation gaps. No verified emissions reductions exist yet as the crediting period has only just begun.

Red Flags

  • FPIC was not conducted for a community-level safe water programme in Nigeria, and a corrective action requires updating the safeguarding principles assessment
  • Six corrective actions remain open, including clarification of baseline parameters, usage assumptions, and justification for the FNRB calculation method
  • No buffer pool percentage is stated and no permanence or reversal data is available for the water infrastructure assets
  • Leakage deduction is 0% with only a 'deemed negligible' justification, without quantified analysis for a distributed community water system

Credit Vintages

IssuedRetiredAvailable
2024
15,180015,180
Total15,180015,180

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, thin justification

Baseline

Project-specific, reassessed 2021

Safeguards

Grievance present, FPIC not conducted

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-06General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents