Safe Water Programme – Nigeria - VPA 100
GS-4313 ↗ · current registry ID: GS12416
#727of 1329 in Industrial#36of 79 in Nigeria#1092of 1801 in Gold Standard (GS)
Audit Analysis
A new Gold Standard safe water and cookstove VPA project in Nigeria with VVB-confirmed additionality but a project-specific baseline, no buffer pool, and FPIC not conducted. Six corrective actions and three material findings in the validation report indicate unresolved documentation gaps. No verified emissions reductions exist yet as the crediting period has only just begun.
Red Flags
- FPIC was not conducted for a community-level safe water programme in Nigeria, and a corrective action requires updating the safeguarding principles assessment
- Six corrective actions remain open, including clarification of baseline parameters, usage assumptions, and justification for the FNRB calculation method
- No buffer pool percentage is stated and no permanence or reversal data is available for the water infrastructure assets
- Leakage deduction is 0% with only a 'deemed negligible' justification, without quantified analysis for a distributed community water system
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2024 | 15,180 | 0 | 15,180 | |
| Total | 15,180 | 0 | 15,180 |
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
0% deduction, thin justification
Project-specific, reassessed 2021
Grievance present, FPIC not conducted
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →