The Safe Water Programme in Nigeria has a VVB-confirmed investment additionality test and a named verification body, but is undermined by a severe FNRB contradiction (82.3 national default vs. 0.96 local field measurement across two verification reports), an unaddressed leakage justification, the absence of any buffer pool or permanence mechanism, and 22 outstanding corrective actions. The project's claim safety is materially weakened by the FNRB discrepancy, which could represent an order-of-magnitude over-crediting risk if the lower local-field value is the correct one.

Red Flags

  • FNRB value contradicts between the 2023 verification report (0.96, local field measurement) and the 2024 verification report (82.3, national default) — an approximately 86-fold difference that is not explained in the extracted record and could indicate a unit error or a material change in the baseline emission factor.
  • Leakage deduction is 0% and the verification report (2024-07-25) records the justification as 'not addressed,' while the monitoring report (2024-07-23) claims it is 'deemed negligible' — the higher-priority VVB document does not support the negligible claim.
  • No buffer pool percentage, no permanence claim period, and no reversal-event record are found in any available document, leaving the project's permanence and reversal risk entirely unquantified.
  • 22 corrective actions remain open, including requirements to fix baseline parameter references (Kenya vs. Nigeria), correct a Cb parameter value, justify sampling design, and provide evidence for treatment capacity values — indicating the monitoring and verification chain has not yet been fully closed.

Credit Vintages

IssuedRetiredAvailable
2021
53,87853,8780
2022
45,41242,2803,132
2023
43,558043,558
2024
40,263040,263
Total183,11196,15886,953

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, justification not addressed per VVB

Baseline

Project-specific, FNRB contradicts between reports

Safeguards

Grievance mechanism and benefit sharing present; FPIC not stated

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-06General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents