Skip to main content
GSEnergy Efficiency - DomesticNigeriaGeneral Methodologyv2.1

Safe Water Programme – Nigeria – VPA 22

GS-3301 ↗ · current registry ID: GS11280

#927of 1329 in Industrial#61of 79 in Nigeria#1351of 1801 in Gold Standard (GS)

4.5/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
3.5
Documentation
5.0

Audit Analysis

The Safe Water Programme in Nigeria has a confirmed investment-test additionality and a named VVB, but is undermined by a severe FNRB discrepancy between the 2023 and 2024 verification reports (82.3 national default vs. 0.96 local field), a 0% leakage deduction with no justification in the verification report, and the absence of any buffer pool or permanence mechanism. Twenty-four corrective actions and multiple cross-document contradictions indicate significant MRV quality issues that erode confidence in the verified emission reductions.

Red Flags

  • FNRB value changed from 0.96 (local field, 2023 report) to 82.3 (national default, 2024 report) — an approximately 86-fold difference that could indicate massive over-crediting or a unit/methodology error
  • Leakage deduction is 0% and the verification report (2024-07-25) records the justification as 'not addressed', while the monitoring report (2024-07-23) claims it is 'deemed negligible' — no quantitative leakage assessment is documented
  • No buffer pool percentage is stated in any available document, leaving no permanence or reversal-risk mitigation mechanism for a 5-year crediting period
  • Twenty-four corrective actions were required by the VVB, including errors in baseline parameters (Kenya references in a Nigerian project), incorrect Cb values, and missing sampling design details
  • FPIC (Free, Prior and Informed Consent) is not confirmed in any available document despite the project serving schools and communities in Nigeria

Credit Vintages

IssuedRetiredAvailable
2021
57,07153,2513,820
2022
52,83711,83741,000
2023
47,085047,085
2024
42,843042,843
Total199,83665,088134,748

Risk Indicators

Additionality

Investment test confirmed by VVB

Permanence

no reversal events reported

Leakage

0% deduction, justification 'not addressed' in verification report

Baseline

Project-specific baseline; no reassessment date stated

Safeguards

Grievance mechanism and benefit sharing present; FPIC not confirmed

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-06General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents