Safe Water Programme – Nigeria – VPA 22
GS-3301 ↗ · current registry ID: GS11280
#927of 1329 in Industrial#61of 79 in Nigeria#1351of 1801 in Gold Standard (GS)
Audit Analysis
The Safe Water Programme in Nigeria has a confirmed investment-test additionality and a named VVB, but is undermined by a severe FNRB discrepancy between the 2023 and 2024 verification reports (82.3 national default vs. 0.96 local field), a 0% leakage deduction with no justification in the verification report, and the absence of any buffer pool or permanence mechanism. Twenty-four corrective actions and multiple cross-document contradictions indicate significant MRV quality issues that erode confidence in the verified emission reductions.
Red Flags
- FNRB value changed from 0.96 (local field, 2023 report) to 82.3 (national default, 2024 report) — an approximately 86-fold difference that could indicate massive over-crediting or a unit/methodology error
- Leakage deduction is 0% and the verification report (2024-07-25) records the justification as 'not addressed', while the monitoring report (2024-07-23) claims it is 'deemed negligible' — no quantitative leakage assessment is documented
- No buffer pool percentage is stated in any available document, leaving no permanence or reversal-risk mitigation mechanism for a 5-year crediting period
- Twenty-four corrective actions were required by the VVB, including errors in baseline parameters (Kenya references in a Nigerian project), incorrect Cb values, and missing sampling design details
- FPIC (Free, Prior and Informed Consent) is not confirmed in any available document despite the project serving schools and communities in Nigeria
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 57,071 | 53,251 | 3,820 | |
| 2022 | 52,837 | 11,837 | 41,000 | |
| 2023 | 47,085 | 0 | 47,085 | |
| 2024 | 42,843 | 0 | 42,843 | |
| Total | 199,836 | 65,088 | 134,748 |
Risk Indicators
Investment test confirmed by VVB
no reversal events reported
0% deduction, justification 'not addressed' in verification report
Project-specific baseline; no reassessment date stated
Grievance mechanism and benefit sharing present; FPIC not confirmed
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →