Skip to main content
GSEnergy Efficiency - DomesticNigeriaGeneral Methodologyv2.1

Safe Water Programme – Nigeria – VPA 23

GS-3302 ↗ · current registry ID: GS11281

#800of 1329 in Industrial#48of 79 in Nigeria#1192of 1801 in Gold Standard (GS)

4.7/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
4.5
Documentation
5.0

Audit Analysis

The Safe Water Programme in Nigeria has a VVB-confirmed investment additionality test and verified usage rates exceeding assumptions, but is undermined by a dramatic FNRB discrepancy between the 2023 and 2024 verification reports (0.96 local-field vs 82.3 national-default), an unaddressed 0% leakage deduction, the absence of any documented buffer pool or permanence mechanism, and 24 corrective actions flagged by the VVB. Data reliability is further weakened by multiple cross-report contradictions and a medium extraction confidence level.

Red Flags

  • FNRB value changed from 0.96 (local-field, 2023 verification report) to 82.3 (national-default, 2024 verification report) — an 86-fold discrepancy that fundamentally alters the emission-reduction calculation basis
  • Leakage deduction of 0% with justification recorded as 'not addressed' in the 2024 verification report, contradicting the monitoring report's claim of 'deemed negligible'
  • No buffer pool percentage or permanence mechanism documented in any available report, leaving reversal risk unmitigated
  • 24 corrective actions required by the VVB, including sampling-design non-compliance, potential systemic bias in chlorine-tablet usage, and incorrect baseline parameters (Kenya references in a Nigerian project)
  • Total ERR figures differ between the 2023 and 2024 verification reports (647,669 vs 1,232,137) and no lifetime ex-ante estimate is available to benchmark pro-rata delivery

Credit Vintages

IssuedRetiredAvailable
2021
52,18352,1830
2022
48,36919,54528,824
2023
43,167043,167
2024
37,963037,963
Total181,68271,728109,954

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, justification 'not addressed' per VVB

Baseline

Project-specific baseline, no reassessment date stated

Safeguards

Grievance mechanism and benefit sharing present; FPIC not stated

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-06General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.