Safe Water Programme – Nigeria – VPA 24
GS-3303 ↗ · current registry ID: GS11282
#801of 1329 in Industrial#49of 79 in Nigeria#1193of 1801 in Gold Standard (GS)
Audit Analysis
The Safe Water Programme in Nigeria has a VVB-confirmed additionality assessment and a named verification body, but suffers from significant data reliability issues including a major FNRB discrepancy between reporting periods, an unaddressed leakage justification, and a project-specific baseline with no stated buffer pool. The exact match between claimed and verified emission reductions, combined with 24 corrective actions, raises concerns about verification rigor.
Red Flags
- FNRB value changed from 0.96 (local field measurement, 2023 report) to 82.3 (national default, 2024 report) — a discrepancy of over 80x if in the same units, or a 14-percentage-point shift if expressed differently; the methodological basis also changed between reports
- Leakage deduction of 0% with justification recorded as 'not addressed' in the 2024 verification report, contradicting the monitoring report's claim of 'deemed negligible'
- Total ERR claimed equals total ERR verified exactly (1,232,137 tCO₂e) with zero VVB adjustment, despite 24 corrective actions and multiple material findings on sampling methodology and potential bias
- Baseline is project-specific with no documented reassessment date, and the 2024 report references Kenya baseline parameters that should reference Nigeria
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 52,032 | 52,032 | 0 | |
| 2022 | 45,599 | 44,688 | 911 | |
| 2023 | 40,809 | 0 | 40,809 | |
| 2024 | 40,810 | 0 | 40,810 | |
| Total | 179,250 | 96,720 | 82,530 |
Risk Indicators
VVB-confirmed investment test
mixed evidence / unresolved risk
0% deduction, justification 'not addressed' in VVB report
Project-specific, no reassessment date stated
Grievance mechanism and benefit sharing present; FPIC not stated
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →