Safe Water Programme – Nigeria – VPA 29

GS-3308 ↗ · current registry ID: GS11287

#853of 1329 in Industrial#54of 79 in Nigeria#1258of 1801 in Gold Standard (GS)

4.6/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
4.0
Documentation
5.0

Audit Analysis

The Safe Water Programme in Nigeria has a VVB-confirmed investment additionality test and a named verification body, but is undermined by a severe emission-factor contradiction (82.3 national default vs. 0.96 local field measurement across two verification reports), an unaddressed 0% leakage deduction, the absence of any buffer pool, and 22 outstanding corrective actions. The project-specific baseline and the unresolved FNRB discrepancy create meaningful over-crediting risk that cannot be dismissed.

Red Flags

  • FNRB value differs by a factor of ~86 between the 2023 verification report (0.96, local field) and the 2024 verification report (82.3, national default), with no documented justification for the change
  • Leakage deduction is 0% and the verification report (2024-07-25) records the justification as 'not addressed', while the monitoring report (2024-07-23) claims it is 'deemed negligible' — the two documents directly contradict each other
  • 22 corrective actions remain open, including sampling-design non-compliance with CDM Appendix 3, unverified treatment-capacity values, and a typographical error referencing the wrong column for a key parameter
  • Baseline is project-specific with no recorded reassessment date, and the FNRB method shifted from local field measurement to national default between reporting periods without explanation

Credit Vintages

IssuedRetiredAvailable
2021
18,17218,1720
2022
32,004032,004
2023
28,812028,812
2024
23,753023,753
Total102,74118,17284,569

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

reversal risk unaddressed

Leakage

0% deduction, justification 'not addressed' per VVB

Baseline

Project-specific; FNRB contradicts across reports

Safeguards

Grievance mechanism and benefit sharing present; FPIC not stated

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-06General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents