Skip to main content
GSEnergy Efficiency - DomesticNigeriaGeneral Methodologyv2.1

Safe Water Programme – Nigeria – VPA 30

GS-3309 ↗ · current registry ID: GS11288

#279of 1329 in Industrial#5of 79 in Nigeria#456of 1801 in Gold Standard (GS)

5.4/ 10
Integrity
5.5
Transparency
5.5
Claim Safety
5.5
Documentation
5.0

Audit Analysis

The Safe Water Programme in Nigeria has a VVB-confirmed investment additionality test and verified usage rates that exceed assumptions, but is undermined by an unaddressed leakage justification, a project-specific baseline with no stated reassessment, the absence of any buffer pool, and a large set of corrective actions (24 items) flagged by the VVB. Significant contradictions between the 2023 and 2024 verification reports—particularly in the FNRB value and method—raise data-reliability concerns that temper confidence in the claimed emission reductions.

Red Flags

  • Leakage deduction is 0% and the verification report (2024-07-25) records the justification as 'not addressed', while the monitoring report (2024-07-23) claims it is 'deemed negligible'—the higher-priority VVB document does not support the negligible claim.
  • FNRB value changed from 0.96 (local field measurement, 2023 report) to 82.3 (national default, 2024 report), a method and magnitude shift that is not explained in the extracted record.
  • 24 corrective actions were required by the VVB, including sampling-design non-compliance, typographical errors referencing the wrong country (Kenya instead of Nigeria), and missing deviation-request documentation.
  • total_err_exante_lifetime is not available in the extracted record, preventing a reliable pro-rata comparison of verified versus expected reductions.

Credit Vintages

IssuedRetiredAvailable
2021
51,00951,0090
2022
53,25619,36033,896
2023
40,929040,929
2024
34,764034,764
Total179,95870,369109,589

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

infrastructure project lowers reversal risk

Leakage

0% deduction; VVB records justification as not addressed

Baseline

Project-specific; no reassessment date stated

Safeguards

Grievance mechanism and benefit sharing present; FPIC not stated

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-06General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents