Safe Water Programme – Nigeria - VPA 75
GS-4338 ↗ · current registry ID: GS12391
#753of 1329 in Industrial#42of 79 in Nigeria#1128of 1801 in Gold Standard (GS)
Audit Analysis
The Safe Water Programme in Nigeria has a VVB-verified additionality assessment and no reported reversal events, but suffers from a project-specific baseline, a 0% leakage deduction with contradictory justifications across documents, and a complete absence of verified emission reduction figures. Five inter-document contradictions and a corrective action on safeguarding documentation further erode confidence in the project's data integrity.
Red Flags
- Total verified ERR is not stated in any available document, making it impossible to confirm whether the 290,960 claimed reductions were actually achieved during the December 2024 monitoring period.
- Leakage justification is contradictory: the PDD (June 2023) states leakage was 'quantified' while another document (April 2024) describes it as 'deemed negligible,' yet the deduction applied is 0%.
- FNRB value shows a 100-fold discrepancy between the validation report (82.3) and an unidentified document (0.82), raising serious questions about unit consistency or data entry error.
- CORSIA eligibility is confirmed while CCP status is not stated, creating an unresolved dual-channel risk for the credits.
- A corrective action was issued requiring the project to update its Safeguarding Principles Assessment, indicating the safeguard documentation was non-compliant at verification.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2024 | 45,152 | 0 | 45,152 | |
| Total | 45,152 | 0 | 45,152 |
Risk Indicators
VVB-verified combined test
no reversals
0% deduction, contradictory justification
Project-specific, reassessed 2021
FPIC and grievance present; CAR outstanding
CORSIA-eligible; CCP status unknown
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →