Skip to main content
GSEnergy Efficiency - DomesticNigeriaGeneral Methodologyv2.1

Safe Water Programme – Nigeria - VPA 76

GS-4337 ↗ · current registry ID: GS12392

#326of 1329 in Industrial#7of 79 in Nigeria#534of 1801 in Gold Standard (GS)

5.3/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
5.5
Documentation
5.0

Audit Analysis

The Safe Water Programme in Nigeria is a Gold Standard project with VVB-verified additionality and a conservative local-field fNRB, but it carries unresolved corrective actions, no FPIC, no stated buffer pool, and no verified emissions reduction data to confirm its ex-ante claims. The project is in an early stage with monitoring data predating the crediting period, limiting the ability to assess actual delivery.

Red Flags

  • Six corrective actions remain open, including clarification of baseline parameters, fNRB calculation basis, and safeguarding assessment completeness
  • No Free, Prior and Informed Consent (FPIC) was conducted despite the project serving vulnerable communities in Nigeria
  • No verified emissions reduction figure is available to confirm the 290,960 tCO₂e ex-ante lifetime claim
  • Monitoring period (Jul 2022 – Dec 2023) precedes the crediting period start (Aug 2024), meaning no in-crediting-period verification data exists yet

Credit Vintages

IssuedRetiredAvailable
2024
42,976042,976
Total42,976042,976

Risk Indicators

Additionality

VVB-verified combined test

Permanence

low inherent reversal risk for water infrastructure

Leakage

0% deduction, 'deemed negligible' without quantified analysis

Baseline

Project-specific baseline, reassessed 2021; corrective actions on parameters open

Safeguards

Grievance mechanism and benefit sharing present; FPIC not conducted; CAR on safeguarding assessment open

Double-claim

CCP and CORSIA status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-06General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents