Safe Water Programme – Nigeria - VPA 77
GS-4336 ↗ · current registry ID: GS12393
#560of 1329 in Industrial#22of 79 in Nigeria#871of 1801 in Gold Standard (GS)
Audit Analysis
The Safe Water Programme in Nigeria has VVB-confirmed additionality and a project-specific baseline reassessed in 2021, but suffers from significant documentation gaps including six outstanding corrective actions, no buffer pool stated, FPIC not conducted, and no verified emissions reduction data available. The monitoring period precedes the crediting period, and the leakage justification of 'deemed negligible' is thin for a community water infrastructure project where reversion to old water sources is a realistic risk.
Red Flags
- Six corrective actions remain open at validation, including clarification of baseline parameters, fNRB calculation basis, and safeguarding assessment completeness
- FPIC (Free, Prior and Informed Consent) was not conducted for a community water project in Nigeria
- Monitoring period (Jul 2022 – Dec 2023) entirely precedes the crediting period (Aug 2024 – Oct 2029), so no verified ERR exists for the crediting window
- Leakage deduction of 0% justified only as 'deemed negligible' without quantified analysis for a project where users may revert to unsafe water sources
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2024 | 43,372 | 0 | 43,372 | |
| Total | 43,372 | 0 | 43,372 |
Risk Indicators
VVB-confirmed combined test
infrastructure risk unaddressed
0% deduction, 'deemed negligible' only
Project-specific, reassessed 2021, not independently measured
Grievance & benefit-sharing present; FPIC not conducted; CAR open
CCP and CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →