Skip to main content
GSEnergy Efficiency - DomesticNigeriaGeneral Methodologyv2.1

Safe Water Programme – Nigeria - VPA 78

GS-4335 ↗ · current registry ID: GS12394

#393of 1329 in Industrial#11of 79 in Nigeria#633of 1801 in Gold Standard (GS)

5.2/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
5.0
Documentation
5.0

Audit Analysis

A Gold Standard safe water and energy efficiency project in Nigeria with VVB-confirmed additionality and a locally measured fNRB, but undermined by the absence of a buffer pool, unperformed FPIC, six outstanding corrective actions, and no verified emission reduction data to validate the 290,960 tCO₂e lifetime claim. Multiple contradictions between the PDD and validation report reduce confidence in the underlying parameters.

Red Flags

  • Six corrective actions remain open at validation, including clarification of baseline parameters, fNRB calculation basis, and safeguarding assessment completeness
  • FPIC was not conducted despite the project distributing infrastructure to vulnerable communities in Nigeria
  • No verified emission reduction data exists; the 290,960 tCO₂e figure is entirely ex-ante with no monitoring-period verification to confirm delivery
  • Monitoring period (Jul 2022 – Dec 2023) predates the crediting period (Aug 2024 – Oct 2029), creating a temporal gap in the evidence chain

Credit Vintages

IssuedRetiredAvailable
2024
41,290041,290
Total41,290041,290

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, thin justification

Baseline

Project-specific, reassessed 2021

Safeguards

Grievance present, FPIC not done

Double-claim

CCP and CORSIA status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-06General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents