Skip to main content
GSEnergy Efficiency - DomesticNigeriaGeneral Methodologyv2.1

Safe Water Programme – Nigeria - VPA 80

GS-4333 ↗ · current registry ID: GS12396

#561of 1329 in Industrial#23of 79 in Nigeria#872of 1801 in Gold Standard (GS)

5.0/ 10
Integrity
5.5
Transparency
4.5
Claim Safety
5.0
Documentation
4.5

Audit Analysis

This Gold Standard safe water and cookstove project in Nigeria has VVB-verified additionality and a local-field fNRB, but remains at the validation stage with six unresolved corrective actions, no verified emission reductions yet, and no documented buffer pool or permanence mechanism. The 0% leakage deduction is justified only as 'deemed negligible' without quantified support, and FPIC was not conducted. Overall, the project shows reasonable design intent but insufficient evidence of robustness to warrant a higher confidence rating.

Red Flags

  • Six corrective actions remain open from the validation report, including clarification of baseline parameters, fNRB calculation basis, and safeguarding assessment completeness
  • No buffer pool or permanence mechanism is documented, and no reversal events data is available
  • FPIC was not conducted despite the project serving vulnerable communities in Nigeria
  • Monitoring period (started 2021-11-01) has no stated end date, and no verified ERR figures exist to confirm delivery
  • 0% leakage deduction justified only as 'deemed negligible' without quantified analysis for a project where users may revert to traditional water sources

Credit Vintages

IssuedRetiredAvailable
2024
35,834035,834
Total35,834035,834

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, 'deemed negligible' only

Baseline

Project-specific, reassessed 2021

Safeguards

Grievance & benefit-sharing present; FPIC not conducted

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-06General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents