Safe Water Programme – Nigeria - VPA 84
GS-4329 ↗ · current registry ID: GS12400
#923of 1329 in Industrial#57of 79 in Nigeria#1347of 1801 in Gold Standard (GS)
Audit Analysis
The Safe Water Programme in Nigeria is a Gold Standard project still in the validation stage, with additionality confirmed by the VVB via a combined test. However, the project carries moderate integrity and claim-safety risks due to a project-specific baseline, a 0% leakage deduction justified only as 'deemed negligible,' six outstanding corrective actions, and no buffer pool or verified monitoring data yet available. The project is not yet in a position to demonstrate over- or under-delivery, as no verified ERR figures exist.
Red Flags
- Six corrective actions remain open, including justification of the fNRB calculation method and clarification of baseline parameters, indicating unresolved data-quality issues at validation
- Leakage deduction of 0% is justified solely as 'deemed negligible' without quantified analysis, which is thin for a safe-water project where diverted or unmet demand could represent leakage
- FPIC was not conducted, and the safeguarding principles assessment required a corrective action to include responses to assessment questions
- The monitoring period (July 2022 – December 2023) precedes the crediting period (August 2024 – October 2029), creating ambiguity about which phase the monitoring data covers
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2024 | 27,657 | 0 | 27,657 | |
| Total | 27,657 | 0 | 27,657 |
Risk Indicators
Combined test, VVB-confirmed
no reversal data
0% deduction, 'deemed negligible' only
Project-specific, reassessed 2021
Grievance mechanism present; FPIC not conducted
CCP and CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →