Skip to main content
GSEnergy Efficiency - DomesticNigeriaGeneral Methodologyv2.1

Safe Water Programme – Nigeria - VPA 89

GS-4324 ↗ · current registry ID: GS12405

#924of 1329 in Industrial#58of 79 in Nigeria#1348of 1801 in Gold Standard (GS)

4.5/ 10
Integrity
5.0
Transparency
4.0
Claim Safety
4.5
Documentation
4.0

Audit Analysis

A Gold Standard safe drinking water project in Nigeria with VVB-verified combined additionality, but significant gaps in permanence safeguards (no buffer pool stated), a thin 0% leakage justification, and six unresolved corrective actions from the validation phase. The project is in early crediting with no verified emission reductions yet, and FPIC was not conducted despite the community-facing nature of the intervention.

Red Flags

  • Six corrective actions remain open from the validation report, including justification of the fNRB calculation method and clarification of baseline data sources
  • FPIC was not conducted for a community water supply project, and the safeguarding principles assessment was flagged as incomplete (CAR#01)
  • Leakage deduction of 0% justified only as 'deemed negligible' without quantified analysis, despite the project distributing water infrastructure to end users

Credit Vintages

IssuedRetiredAvailable
2024
28,304028,304
Total28,304028,304

Risk Indicators

Additionality

VVB-verified combined test

Permanence

no reversal data

Leakage

0% deduction, 'deemed negligible' only

Baseline

Project-specific; reassessed 2021

Safeguards

Grievance & benefit sharing present; FPIC not conducted; CAR open

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-06General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents