Safe Water Programme – Nigeria - VPA 89
GS-4324 ↗ · current registry ID: GS12405
#924of 1329 in Industrial#58of 79 in Nigeria#1348of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard safe drinking water project in Nigeria with VVB-verified combined additionality, but significant gaps in permanence safeguards (no buffer pool stated), a thin 0% leakage justification, and six unresolved corrective actions from the validation phase. The project is in early crediting with no verified emission reductions yet, and FPIC was not conducted despite the community-facing nature of the intervention.
Red Flags
- Six corrective actions remain open from the validation report, including justification of the fNRB calculation method and clarification of baseline data sources
- FPIC was not conducted for a community water supply project, and the safeguarding principles assessment was flagged as incomplete (CAR#01)
- Leakage deduction of 0% justified only as 'deemed negligible' without quantified analysis, despite the project distributing water infrastructure to end users
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2024 | 28,304 | 0 | 28,304 | |
| Total | 28,304 | 0 | 28,304 |
Risk Indicators
VVB-verified combined test
no reversal data
0% deduction, 'deemed negligible' only
Project-specific; reassessed 2021
Grievance & benefit sharing present; FPIC not conducted; CAR open
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →