Skip to main content
GSEnergy Efficiency - DomesticNigeriaGeneral Methodologyv2.1

Safe Water Programme – Nigeria - VPA 90

GS-4323 ↗ · current registry ID: GS12406

#562of 1329 in Industrial#24of 79 in Nigeria#873of 1801 in Gold Standard (GS)

5.0/ 10
Integrity
5.2
Transparency
4.8
Claim Safety
5.0
Documentation
5.0

Audit Analysis

A Gold Standard safe drinking water project in Nigeria at the validation stage, with VVB-confirmed combined additionality and a project-specific baseline reassessed in 2021. However, the absence of a stated buffer pool, a thin 0% leakage justification, six outstanding corrective actions, and the lack of FPIC collectively limit confidence in the project's integrity and claim safety. No verified emission reductions are yet available, as the project has not entered its crediting period.

Red Flags

  • Six corrective actions remain open at validation, including justification of the fNRB calculation method, clarification of baseline data sources, and an incomplete safeguarding principles assessment.
  • FPIC was not conducted, and the grievance mechanism and benefit-sharing arrangements, while mentioned, lack the depth expected for a community-level water project in Nigeria.
  • Leakage is set at 0% with only a 'deemed negligible' justification, with no quantitative analysis of potential diversion of water to non-credited uses.

Credit Vintages

IssuedRetiredAvailable
2024
25,904025,904
Total25,904025,904

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, thin justification

Baseline

Project-specific, reassessed 2021

Safeguards

Grievance & benefit sharing present, no FPIC

Double-claim

CCP and CORSIA status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-06General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents