Safe Water Programme – Nigeria - VPA 91
GS-4322 ↗ · current registry ID: GS12407
#728of 1329 in Industrial#37of 79 in Nigeria#1093of 1801 in Gold Standard (GS)
Audit Analysis
This Gold Standard safe water and cookstove VPA project in Nigeria has VVB-verified additionality and a stated MRV framework, but sits at the validation stage with six unresolved corrective actions, a thin 0% leakage justification, no stated buffer pool or permanence mechanism, and FPIC not conducted. Multiple contradictions between the PDD and validation report (fNRB method, crediting period, additionality test type) reduce confidence in the underlying data. The project has not yet entered its crediting period, so no verified emissions reductions are available to assess over- or under-delivery.
Red Flags
- Six corrective actions remain open at validation, including justification of the fNRB calculation method (older Tool 30 version) and clarification of baseline parameter data sources
- FPIC was not conducted, yet Gold Standard requires free, prior and informed consent; the safeguarding principles assessment itself was flagged for update (CAR#01)
- 0% leakage deduction justified only as 'deemed negligible' with no quantified assessment, which is thin for a project distributing water infrastructure and cookstoves where diversion or substitution is plausible
- No buffer pool percentage or permanence mechanism is stated in any available document, leaving reversal risk unaddressed
- Contradictions between the PDD and validation report on fNRB method (national default vs local field) and crediting period start date (June vs August 2024) indicate unresolved data inconsistencies
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2024 | 25,706 | 0 | 25,706 | |
| Total | 25,706 | 0 | 25,706 |
Risk Indicators
VVB-verified combined test
mixed evidence / unresolved risk
0% deduction, 'deemed negligible' only
Project-specific, corrective actions open on data sources
Grievance mechanism present but FPIC not conducted
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →