Skip to main content
GSEnergy Efficiency - DomesticNigeriaGeneral Methodologyv2.1

Safe Water Programme – Nigeria - VPA 93

GS-4320 ↗ · current registry ID: GS12409

#563of 1329 in Industrial#25of 79 in Nigeria#874of 1801 in Gold Standard (GS)

5.0/ 10
Integrity
5.5
Transparency
4.5
Claim Safety
5.0
Documentation
4.5

Audit Analysis

This Gold Standard safe-water project in Nigeria is at the validation stage with no verification data yet available. Additionality was confirmed by the VVB via a combined test, and safeguards and a grievance mechanism are in place, but the project-specific baseline, a 0% leakage deduction justified only as 'deemed negligible,' the absence of a buffer pool, and the lack of FPIC limit confidence in the integrity of the claims. Two contradictions between documents (additionality test type and fNRB method) and six outstanding corrective actions further temper the assessment.

Red Flags

  • No verified emission reduction data exists; the project is still at validation stage with the crediting period only beginning in August 2024
  • Leakage deduction is 0% with only a 'deemed negligible' justification and no quantified analysis of household reversion risk
  • FPIC was not conducted despite the project distributing water infrastructure to communities in Nigeria
  • Six corrective actions remain open at validation, including justification for the fNRB calculation tool version and clarification of baseline parameter data sources

Credit Vintages

IssuedRetiredAvailable
2024
20,51918,0002,519
Total20,51918,0002,519

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

no reversal data yet

Leakage

0% deduction, 'deemed negligible' only

Baseline

Project-specific, reassessed 2021

Safeguards

Grievance & benefit-sharing present; no FPIC

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-06General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents