Safe Water Programme – Nigeria - VPA 96
GS-4317 ↗ · current registry ID: GS12412
#564of 1329 in Industrial#26of 79 in Nigeria#875of 1801 in Gold Standard (GS)
Audit Analysis
The Safe Water Programme in Nigeria is a Gold Standard energy-efficiency project with VVB-confirmed additionality and a locally measured fNRB, but it lacks a verification report, has no buffer pool, and carries six open corrective actions from validation. The absence of verified emission-reduction data and the thin leakage justification (0% deemed negligible) limit confidence in the claimed 290,960 tCO₂e lifetime figure. Overall, the project shows a reasonable design but insufficient post-validation evidence to confirm delivery.
Red Flags
- No verification report found in the extracted record; total verified ERR is unavailable, so the claimed 290,960 tCO₂e lifetime figure cannot be independently confirmed.
- Six corrective actions remain open from the 2024 validation, including clarification of baseline data sources, the fNRB tool version used, and the safeguarding assessment.
- Free, Prior and Informed Consent (FPIC) was not conducted, despite the project distributing water infrastructure to communities in Nigeria.
- The monitoring period (Jul 2022 – Dec 2023) predates the crediting period (Aug 2024 – Oct 2029), creating ambiguity about which period the monitoring data covers.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2024 | 18,398 | 0 | 18,398 | |
| Total | 18,398 | 0 | 18,398 |
Risk Indicators
VVB-confirmed combined test
no reversal data
0% deduction, 'deemed negligible'—thin justification
Project-specific baseline, reassessed 2021
Grievance mechanism present; FPIC not conducted
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →