Skip to main content
GSEnergy Efficiency - DomesticNigeriaGeneral Methodologyv2.1

Safe Water Programme – Nigeria - VPA 97

GS-4316 ↗ · current registry ID: GS12413

#565of 1329 in Industrial#27of 79 in Nigeria#876of 1801 in Gold Standard (GS)

5.0/ 10
Integrity
5.5
Transparency
4.5
Claim Safety
5.0
Documentation
5.0

Audit Analysis

The Safe Water Programme in Nigeria is a Gold Standard project with a VVB-confirmed combined additionality test and a project-specific baseline, but it lacks a buffer pool, has no verified emission reduction data yet, and carries several unresolved documentation gaps flagged by the validation body. The absence of FPIC and the reliance on an assumed (unverified) usage rate of 0.9 introduce moderate over-crediting and safeguard risks.

Red Flags

  • FPIC was not conducted despite the project distributing water infrastructure to communities in Nigeria, a significant safeguard gap
  • Six corrective actions were required at validation, including justification of the fNRB tool version and clarification of baseline parameters, indicating documentation weaknesses
  • Usage rate of 0.9 is assumed but has not been verified through monitoring, creating over-crediting risk
  • No verified emission reduction figure is available; the project has not yet completed a verification cycle

Credit Vintages

IssuedRetiredAvailable
2024
18,648018,648
Total18,648018,648

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

low inherent reversal risk for water infrastructure

Leakage

0% deduction, 'deemed negligible' without quantification

Baseline

Project-specific baseline, reassessed 2021

Safeguards

Grievance mechanism and benefit sharing present; FPIC not conducted

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-06General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents