Skip to main content
GSEnergy Efficiency - DomesticNigeriaGeneral Methodologyv2.1

Safe Water Programme – Nigeria - VPA 98

GS-4315 ↗ · current registry ID: GS12414

#730of 1329 in Industrial#39of 79 in Nigeria#1095of 1801 in Gold Standard (GS)

4.8/ 10
Integrity
5.0
Transparency
4.5
Claim Safety
4.5
Documentation
5.0

Audit Analysis

The Safe Water Programme in Nigeria is a Gold Standard project in its early validation phase with a confirmed combined additionality test and a locally measured fNRB, but it carries notable concerns: a project-specific baseline, a 0% leakage deduction justified only as 'deemed negligible,' no FPIC conducted, and six outstanding corrective actions from the validation body. No verified emission reductions exist yet, so over- or under-delivery cannot be assessed.

Red Flags

  • Six corrective actions remain open from the validation report, including clarification of baseline parameters, fNRB calculation basis, and safeguarding assessment gaps
  • FPIC was not conducted despite the project serving vulnerable communities in Nigeria
  • Leakage deduction is 0% with only a 'deemed negligible' justification and no quantified analysis
  • No verified emission reduction data exists; the project has not yet produced a monitoring report

Credit Vintages

IssuedRetiredAvailable
2024
17,080017,080
Total17,080017,080

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, 'deemed negligible' only

Baseline

Project-specific, reassessed 2021, open CARs

Safeguards

Grievance & benefit sharing present, FPIC absent

Double-claim

CCP and CORSIA status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-06General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents