Safe Water Programme – Nigeria - VPA 98
GS-4315 ↗ · current registry ID: GS12414
#730of 1329 in Industrial#39of 79 in Nigeria#1095of 1801 in Gold Standard (GS)
Audit Analysis
The Safe Water Programme in Nigeria is a Gold Standard project in its early validation phase with a confirmed combined additionality test and a locally measured fNRB, but it carries notable concerns: a project-specific baseline, a 0% leakage deduction justified only as 'deemed negligible,' no FPIC conducted, and six outstanding corrective actions from the validation body. No verified emission reductions exist yet, so over- or under-delivery cannot be assessed.
Red Flags
- Six corrective actions remain open from the validation report, including clarification of baseline parameters, fNRB calculation basis, and safeguarding assessment gaps
- FPIC was not conducted despite the project serving vulnerable communities in Nigeria
- Leakage deduction is 0% with only a 'deemed negligible' justification and no quantified analysis
- No verified emission reduction data exists; the project has not yet produced a monitoring report
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2024 | 17,080 | 0 | 17,080 | |
| Total | 17,080 | 0 | 17,080 |
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
0% deduction, 'deemed negligible' only
Project-specific, reassessed 2021, open CARs
Grievance & benefit sharing present, FPIC absent
CCP and CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →