Safe Water Programme – Nigeria - VPA 99
GS-4314 ↗ · current registry ID: GS12415
#925of 1329 in Industrial#59of 79 in Nigeria#1349of 1801 in Gold Standard (GS)
Audit Analysis
This Gold Standard safe water supply project in Nigeria has a VVB-confirmed combined additionality test and documented safeguards, but sits at the validation stage with no verified emission reductions yet. Six corrective actions and three material findings from the validation report raise concerns about baseline parameter accuracy and usage assumptions. The absence of any monitoring or verification data, combined with a project-specific baseline and a thin leakage justification, limits confidence in the claimed 290,960 tCO₂e lifetime reduction.
Red Flags
- Six corrective actions required at validation, including clarification of baseline parameters, usage assumptions, and justification for an older version of the fNRB calculation tool
- No verified emission reduction data exists; the monitoring period has no end date and usage rate (assumed 0.9) has never been independently verified
- FPIC was not conducted despite this being a community-level safe water programme in Nigeria
- Leakage deduction is 0% with only a 'deemed negligible' justification, with no quantified analysis of water diversion or non-target use
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2024 | 15,330 | 0 | 15,330 | |
| Total | 15,330 | 0 | 15,330 |
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
0% deduction, 'deemed negligible' only
Project-specific, corrective actions on parameters
Documented but FPIC not conducted
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →