SAMSUN LANDFILL GAS TO ENERGY PROJECT, TURKEY

GS-1670 ↗

4.6 / 10
Integrity
5.5
Transparency
4.5
Claim Safety
4.0
Documentation
4.0

Score Breakdown

Integrity

verified Additionality confirmed by the VVB in the verification report (investment test stated, verification_report 2022-04-01)

missing Multiple corrective actions required (CAR-1 to CAR-7) in the monitoring/verification package indicating substantive errors in emission reduction reporting and project data (monitoring_report 2022-04-01)

Transparency

verified VVB named (Re Carbon Ltd.) and monitoring period provided (monitoring_report 2019) with public registry Gold Standard listed

missing Extraction confidence is low and there are several contradictions between documents (e.g., ERR, FPIC/grievance presence), which weakens traceability of key numbers

Claim Safety

missing Project is CORSIA-eligible, creating dual-claim risk if not explicitly managed (corsia_eligible true)

inferred Mixed signals on leakage and grid EF: leakage deduction reported as 0% but documented as 'quantified' in the latest verification while earlier documents deemed negligible and grid EF values contradict across reports

Documentation

verified Large document set used (n_docs_used = 40) including validation, verification and monitoring reports

missing Min extraction confidence is low and recent verification lists multiple CARs, indicating documentation quality and consistency problems (verification_report 2022-04-01)

Detailed Analysis

Integrity

The verification report confirms additionality through an investment test and names an independent VVB (verification_report 2022-04-01), which supports integrity. However, there are seven corrective action requests in the verification/monitoring documents indicating misreported emission reductions, inconsistent equipment/capacity data, and use of an outdated monitoring form (monitoring_report 2022-04-01). Buffer pool percentage is not stated and reversal events are listed as not addressed, which raises permanence concerns. Baseline methodology is project-specific (ACM0002) with a reassessment in 2025, which is positive but not sufficient to offset the above issues.

Transparency

Transparency is mixed: the project lists a named VVB, a monitoring period, registry (Gold Standard) and many evidence documents (n_docs_used = 40). However, min extraction confidence is low (at least one key document poorly readable) and there are clear contradictions across documents (e.g., presence of FPIC/grievance, ERR totals, grid emission factor), which reduces confidence in which figures are authoritative. Some key inputs (buffer pool percentage, usage rate assumptions, FNRB) are not stated in the extracted record.

Claim Safety

There is elevated claim risk because the project is CORSIA-eligible (corsia_eligible true) and CCP status is not mentioned, so dual-claim management is unclear. The project reports a leakage deduction of 0% but the justification varies between 'quantified' in the latest verification and 'deemed negligible' in earlier documentation, and grid emission factor values conflict between 0.3953 and 0.559 across reports — these contradictions create over-crediting risk. No reversal events are addressed and buffer pool is not stated, increasing risks from reversals.

Documentation

Documentation breadth is good (validation, verification, monitoring reports and stakeholder consultation listed), and a recent baseline reassessment is recorded (2025). Nevertheless, the extraction confidence is low and the verification process produced several corrective actions, indicating gaps in how information was presented and verified. The verification report is recent (2022) and generally privileged, but unresolved CARs lower the documentation quality.

Overall

I privileged the most recent verification/monitoring documents (verification_report and monitoring_report dated 2022-04-01) when resolving contradictions because they are the latest authoritative reviews; where an unknown source supplied a conflicting 'verified ERR' figure dated 2022-03-13 I still prefer the named verification report outputs. Specific contradictions addressed: FPIC and grievance mechanism — older PDD (2012-04-13) did not show these, while the verification report (2022-04-01) confirms FPIC and a grievance mechanism; I privileged the 2022 verification since it reflects later stakeholder work. Total ERR/ERR verified — records conflict (values 58,669; 288,074; 330,393); I privilege the most recent verification monitoring package (2022) but note unresolved discrepancies flagged by CARs and an unknown-source higher verified ERR (2022-03-13) which reduces ER reliability. Leakage justification — changed from 'deemed negligible' (2020) to 'quantified' (2022); I privilege the 2022 verification which suggests improved treatment, but the leakage deduction remains 0% and the prior inconsistency weakens confidence. Additionality test type — varies between 'combined' (2021) and 'investment' (2022); I privilege the 2022 confirmation of an investment test but flag inconsistency. Grid emission factor — conflicting values (0.559 in 2020 vs 0.3953 in 2022); I privilege the 2022 verification but the change materially affects ERs and indicates baseline sensitivity. Crediting period — updated in 2022 to 2018–2025 versus earlier 2011–2018; I accept the 2022 period as current but note the change. In sum, the most recent verification documentation is used preferentially, but numerous contradictions and CARs meaningfully reduce confidence and the scores have been adjusted downward to reflect data reliability concerns.

Audit Analysis

The project shows some core strengths (VVB-confirmed additionality, recent baseline reassessment) but multiple verification corrective actions, documented contradictions between older and newer documents, and low extraction confidence reduce trust. There is moderate risk of data/credit inconsistency and possible over-crediting, and CORSIA eligibility raises claim-management concerns.

Project Description

About the project The Samsun Landfill Project is a Landfill Gas (“LFG”) to Energy Project, developed by “Samsun Avdan Enerji Üretim ve Tic. A.Ş.” which is located south-west of Samsun city centre, at an air distance of ca. 8 km in Turkey. The proposed activity involves the collection and utilization of the LFG with an electricity component with an installed capacity 8.4 MWe. The electricity energy produced from LFG is calculated based on conservative assumptions and measurements. Calculations will be done through the Biogas and LFG Gas amounts. Expected disposed waste amount is 304,466 tonnes, corresponding to an average of 800 t/day. This amount is expected to rise in coming years, reaching 848,232 tonnes in 2040 when the landfill site will be filled up and closed. Additional information Estimated electricity generation is 54,600 MWh per year. This landfill site is expected to be operational until 2040. Total emission reduction will be 805,435 tonnes of CO2e for the second crediting period. Annual average over the crediting period will be 115,062 tCO2e. The project operational lifetime is 28 years, according to the contract with the Samsun Municipality.

Red Flags

  • Multiple corrective action requests (CAR-1 through CAR-7) in the verification report indicating errors in reported emission reductions and equipment/commissioning details
  • Contradictory records across documents (e.g., FPIC, grievance mechanism, ERR figures, grid EF and crediting period) reducing reliability of reported ERs
  • Min extraction confidence is low, indicating that at least one key document was poorly readable or parsed

Credit Vintages

Issued Retired Available
2011
3,096 3,035 61
2012
45,413 45,223 190
2013
107,036 107,036 0
2014
78,958 78,958 0
2016
81,009 81,009 0
2017
179,248 179,215 33
2018
27,817 24,499 3,318
2019
54,140 1,082 53,058
2020
197,624 3,984 193,640
2021
215,004 6,493 208,511
2022
163,362 0 163,362
2023
46,823 0 46,823
Total 1,199,530 530,534 668,996

Cosa migliorerebbe questo punteggio

  • Resolve all corrective actions and publish a corrected monitoring report with reconciled ERR totals and equipment/capacity details
  • Publish clear statements on buffer pool treatment, reversal risk management, and double-claiming/CORSIA/CCP status; improve public documentation quality to raise extraction confidence

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed

Permanence

reversal risk unaddressed

Leakage

0% deduction; mixed justification

Baseline

project baseline; recently reassessed

Safeguards

FPIC/grievance noted but inconsistently documented

Double-claim

CORSIA-eligible

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
GS-1670 ↗

Registry Documents

Analysis Provenance Scored 2026-04-23 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti