Santa Marta Landfill Gas (LFG) Capture for Electricity Generation Project

GS-689 ↗ · current registry ID: GS3976

#177of 268 in Biogas#21of 31 in Chile#1353of 1801 in Gold Standard (GS)#109of 159 in ACM0001

4.5/ 10
Integrity
4.0
Transparency
4.5
Claim Safety
5.0
Documentation
4.5

Audit Analysis

The Santa Marta LFG project is a long-running Gold Standard landfill gas-to-electricity project with VVB-verified additionality, but it is burdened by a serious contradiction over whether gas capture is legally required, an extensive list of calibration and data-quality findings, a 0% leakage deduction with no stated justification, and the absence of a buffer pool. The project delivered roughly 73% of its pro-rata ex-ante expectation for the elapsed monitoring period, which is conservative, yet the underlying data reliability is undermined by repeated metering and reporting errors across multiple verification cycles.

Red Flags

  • Contradiction on whether LFG capture is legally required: the 2016 PDD states it is not, while the 2026 monitoring report states it is — if the legal requirement post-dates the PDD, the additionality claim is fundamentally undermined.
  • Leakage deduction of 0% with justification recorded as 'not addressed' in the most recent verification report (2023), contradicting an earlier 2019 report that described it as 'quantified'.
  • No buffer pool percentage or permanence mechanism is stated in any available document for a project with inherent reversal risk (landfill gas composition and flow can decline).
  • Environmental Compliance Program has not been accepted by the Chilean Environmental Superintendency — an open finding carried across multiple verification cycles.
  • Extensive and recurring calibration failures (flow meters, pressure transmitters, temperature transmitters, gas analyzers) across multiple monitoring periods, requiring repeated conservative error penalties.

Credit Vintages

IssuedRetiredAvailable
2014
124,582124,5793
2015
424,111424,1056
2016
306,737306,7370
2017
397,252397,2520
2018
368,869365,0423,827
2019
328,451328,4510
2020
237,524237,5240
2021
250,301246,7593,542
2022
273,896259,68714,209
2023
244,191243,201990
2024
178,9521,050177,902
Total3,134,8662,934,387200,479

Risk Indicators

Additionality

VVB-verified but legal-requirement contradiction

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, justification not addressed

Baseline

Project-specific, modeled, no reassessment date

Safeguards

Grievance and benefit-sharing present; ECP not accepted

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-06ACM0001

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents