Skip to main content
VCSEnergy industries (renewable/non-renewable sources); Waste handling and disposalChina Registry: RegisteredACM0001

Sanya Landfill Gas Power Generation Project

VCS-2337 ↗

#6of 189 in Methane#52of 1084 in China#64of 1339 in Verra (VCS)#4of 159 in ACM0001

6.5/ 10
Integrity
6.5
Transparency
6.5
Claim Safety
6.0
Documentation
7.0

Audit Analysis

The Sanya Landfill Gas Power Generation Project is a well-structured VCS project with VVB-confirmed additionality, no material findings, and no reversal events. However, the 0% leakage deduction is supported by contradictory justifications across documents, and the absence of a buffer pool leaves permanence risk partially unaddressed. Overall a solid but not exceptional project with moderate data gaps.

Red Flags

  • Leakage deduction of 0% with contradictory justification: the verification report states leakage was 'not addressed' while the monitoring report (same date) states it was 'deemed negligible' — for a landfill gas project, unquantified leakage is a material concern
  • CORSIA eligibility and CCP status are both unstated, creating uncertainty about dual-channel crediting risk

Credit Vintages

IssuedRetiredAvailable
2019
63,09163,0910
2020
80,55080,5500
2021
47,28847,2880
2022
10,000010,000
Total200,929190,92910,000

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, contradictory justification

Baseline

Project-specific, measured; PDD says modeled

Safeguards

FPIC, grievance mechanism, safeguards documented

Double-claim

CORSIA and CCP status both unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03ACM0001

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents