The Şarkısla Biogas Power Plant is a VCS-registered avoidance project in Turkey that displaces grid electricity with biogas-generated power. While additionality was confirmed by TÜV SÜD America via a regulatory test and safeguards (FPIC, grievance mechanism) are in place, the project carries significant quality concerns: the VVB reduced the project proponent's claimed emissions reductions by roughly 48% (from 146,754 to 76,364 tCO₂e), 13 corrective action requests were raised during verification, and the PDD contained multiple gaps including missing leakage justification and incomplete emission calculations.
Red Flags
- The project proponent's monitoring report claimed 146,754 tCO₂e for the 2021–2023 period, but the VVB verified only 76,364 tCO₂e — a 48% over-claim that was caught during verification
- 13 Corrective Action Requests, 2 Additional Documentation Requests, and 5 Clarification Requests were raised during verification, all indicating material gaps in the PDD and monitoring data
- Leakage was assigned a 0% deduction with a 'deemed negligible' justification, yet the PDD originally contained no leakage treatment at all (flagged as a CAR)
- The PDD lacked technical specifications for the biodigester, flaring system, and generating units, and emission reduction equations were missing from Section 4.4
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed regulatory test
mixed evidence / unresolved risk
0% deduction, justification added post-CAR
Project-specific, measured, no reassessment date
FPIC conducted, grievance mechanism present
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →