Sea Cave® True Blue Carbon®, Kenya

ICR-382 ↗

#8of 11 in Blue carbon#99of 154 in Intl. Carbon Registry (ICR)

3.8/ 10
Integrity
3.5
Transparency
4.0
Claim Safety
4.0
Documentation
4.0

Audit Analysis

Sea Cave True Blue Carbon is a pre-implementation blue carbon project in Kenya (crediting period 2027–2041) with a combined additionality test and a project-specific baseline, but critical permanence protections are absent: no buffer pool is stated, no non-permanence insurance has been secured, and reversal risk is explicitly unaddressed. The 0% leakage deduction is justified only as 'deemed negligible' without quantification, and FPIC was not conducted. The project is in early design stage with only a PDD available, limiting the depth of assessment.

Red Flags

  • No insurance policy for non-permanence risk has been secured, and reversal events are explicitly not addressed — a significant gap for a blue carbon project exposed to storm, disease, and sea-level-rise risks
  • No buffer pool percentage is stated in the PDD, leaving no quantified safety margin against potential reversals
  • FPIC was not conducted despite the project being in a community-adjacent coastal setting in Kenya
  • Leakage deduction is 0% with only a 'deemed negligible' justification and no quantified analysis
  • Credit type is listed as 'Hybrid both' with no CORSIA or CCP status stated, raising potential dual-channel or double-claiming ambiguity

Credit Vintages

IssuedRetiredAvailable
2027
47,000047,000
2028
95,000095,000
2029
143,0000143,000
2030
190,5000190,500
2031
191,2000191,200
2032
191,2000191,200
2033
191,2000191,200
2034
191,2000191,200
2035
191,2000191,200
2036
191,2000191,200
2037
191,2000191,200
2038
191,2000191,200
2039
191,2000191,200
2040
191,2000191,200
2041
191,2000191,200
Total2,578,70002,578,700

Risk Indicators

Additionality

Combined test stated but VVB verification not confirmed

Permanence

No insurance, no buffer pool, reversals unaddressed

Leakage

0% deduction, 'deemed negligible' without quantification

Baseline

Project-specific baseline, no reassessment date stated

Safeguards

Safeguards mentioned but FPIC not conducted, no grievance mechanism

Double-claim

Hybrid both type; CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-08General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents