Selco Clean Energy Products Grouped Project
#391of 975 in India#483of 1339 in Verra (VCS)#13of 72 in AMS-II.I
Audit Analysis
The Selco grouped project (LED lighting, solar water heating, solar PV) in India is a registered VCS project with VVB-confirmed additionality and a reasonable monitoring framework, but is undermined by a 0% buffer pool, a project-specific baseline with an unresolved method contradiction, FPIC not conducted, and a low extraction confidence across 25 source documents. The verified ERR matches the claimed figure for the 2019–2022 monitoring period, but the absence of a lifetime ex-ante estimate and multiple data inconsistencies limit confidence in the overall credit volume.
Red Flags
- Buffer pool is 0% with no permanence risk mitigation beyond the project's renewable-energy character; no explicit reversal-risk analysis in the verification report
- Baseline method is contradictory: the verification report (Dec 2024) states 'project' while the monitoring report (Apr 2020) states 'jurisdictional' — the more recent VR is privileged, but the discrepancy weakens baseline confidence
- FPIC was not conducted (stated as false in the verification report), and benefit-sharing is described as absent in the most recent verification report, creating a safeguards gap
- Minimum extraction confidence is rated 'low', meaning at least one key document was poorly readable, reducing reliability of the extracted record
- 13 Corrective Action Requests were raised during verification (including double-counting prevention, sole-claim evidence, and data-recording gaps), indicating material data-quality issues that had to be remediated
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 4,059 | 4,059 | 0 | |
| 2015 | 9,743 | 9,743 | 0 | |
| 2016 | 13,909 | 13,909 | 0 | |
| 2017 | 17,082 | 17,082 | 0 | |
| 2018 | 20,678 | 20,506 | 172 | |
| 2019 | 41,850 | 41,850 | 0 | |
| 2020 | 33,638 | 33,638 | 0 | |
| 2022 | 23,339 | 23,339 | 0 | |
| Total | 164,298 | 164,126 | 172 |
Risk Indicators
VVB-confirmed barrier test
mixed evidence / unresolved risk
0% deduction, deemed negligible for energy
Project-specific, method contradicted across docs
Grievance present, FPIC not conducted
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →