Shaanxi Fuyuan Dangjiahe CMM Power Generation Project

VCS-5622 ↗

#58of 189 in Methane#588of 1084 in China#675of 1339 in Verra (VCS)#7of 35 in ACM0008

5.1/ 10
Integrity
5.2
Transparency
4.8
Claim Safety
5.2
Documentation
5.2

Audit Analysis

A coal-mine-methane power-generation project under VCS with a VVB-confirmed combined additionality test and inherently low reversal risk, but undermined by three material findings (meter inconsistency, IRR evidence gap, and an unassessed baseline alternative), a 0% leakage deduction justified only as 'deemed negligible,' and identical claimed and verified ERR figures that suggest no independent monitoring has yet been performed. The project is registered and safeguards are in place, but the baseline robustness and MRV transparency warrant caution before relying on the full 1.77 MtCO₂e lifetime claim.

Red Flags

  • Total ERR claimed and verified are identical (1,769,980 tCO₂e), indicating the 'verified' figure is the ex-ante estimate rather than independently measured monitoring results.
  • CAR 02: the IRR analysis in the additionality assessment was found inconsistent with supporting evidence, requiring a new IRR sheet and financial audit report.
  • The baseline did not assess whether partial venting combined with partial CMM utilization is a feasible alternative, as flagged by the VVB in a corrective action.
  • Leakage deduction is 0% with only a 'deemed negligible' justification (per the validation report), without a quantified leakage analysis.
  • CCP status and CORSIA eligibility are not stated in any available document, leaving dual-channel risk unaddressed.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed but IRR evidence gap (CAR 02)

Permanence

CMM consumed in combustion; reversal not applicable

Leakage

0% deduction, 'deemed negligible' only

Baseline

Project-specific, modeled; alternative not assessed

Safeguards

FPIC, grievance mechanism, safeguards documented

Double-claim

CCP and CORSIA status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-29ACM0008

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents