Shandong Xiantan Composting Project
#280of 1329 in Industrial#409of 1084 in China#485of 1339 in Verra (VCS)#14of 43 in AMS-III.F
Audit Analysis
The Shandong Xiantan Composting Project is a VCS-registered manure management project with a VVB-confirmed investment additionality test and a reasonable pro-rata delivery of approximately 92% of the expected emissions reductions for the elapsed monitoring period. However, the verification report raised nine material findings and eight corrective actions covering inconsistencies in cost data, livestock type, project description, and baseline details, which materially weaken confidence in the underlying data. The project-specific modeled baseline, unquantified 0% leakage deduction, and absence of a stated buffer pool or CORSIA/CCP eligibility leave several integrity and claim-safety questions open.
Red Flags
- Nine material findings and eight corrective actions were raised in the verification report, including inconsistent O&M costs, a mismatch between swine and chicken as the livestock type across documents, and an inaccurate project description that implied a biogas heat-generation system not actually present.
- Leakage deduction is 0% with only a 'deemed negligible' justification and no quantified analysis, which is thin for a manure-management project where diverted manure could be processed elsewhere.
- The validation report (October 2023) describes the baseline as 'measured' while the verification report (August 2023) describes it as 'modeled' — an unresolved inconsistency that affects baseline credibility.
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 34,068 | 34,068 | 0 | |
| 2022 | 50,818 | 50,818 | 0 | |
| Total | 84,886 | 84,886 | 0 |
Risk Indicators
VVB-confirmed investment test
mixed evidence / unresolved risk
0% deduction, 'deemed negligible' only
Project-specific, modeled; measured-vs-modeled contradiction
Grievance mechanism present; FPIC not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →