Shaoyang Xinning LFG Power Generation Project
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB, and the project uses a combined additionality test under ACM0001.
missing Leakage is not addressed and no leakage deduction is stated; permanence treatment is also unclear because buffer pool coverage is not found in the extracted record.
Transparency
verified The monitoring period and crediting period are clearly stated, and the VVB is identified as Carbon Check (India) Private Ltd.
missing No verified or claimed emission reduction totals are available, and key monitoring details such as usage monitoring method are not stated in available documents.
Claim Safety
verified The project is a landfill gas project under a recognized VCS methodology, which supports a structured baseline approach.
missing No quantified leakage treatment, no FNRB value, and no CORSIA or CCP status are stated, leaving over-crediting and claim-use risk unresolved.
Documentation
verified Multiple document types were used, including monitoring, validation, PDD, and issuance materials, and extraction confidence is high.
missing The record still lacks several core quantitative fields, and the contradiction on reversal events reduces confidence in the completeness of the evidence base.
Detailed Analysis
Integrity
The monitoring record shows a combined additionality test and says additionality was verified by the VVB, which is a meaningful positive. However, leakage is not addressed, no leakage deduction is stated, and buffer pool coverage is not found in the extracted record, so the project’s non-permanence and leakage treatment remain weakly evidenced. The baseline is project-based, but the last reassessment date is not stated, which limits confidence in baseline robustness.
Transparency
The monitoring period from 2023-07-01 to 2025-02-28 and the crediting period through 2033-06-30 are clearly identified, and the VVB is named as Carbon Check (India) Private Ltd. But the extracted record does not provide verified or claimed emission reduction totals, and the usage monitoring method is not stated. That leaves the MRV trail incomplete despite the presence of several core document types.
Claim Safety
Claim safety is only moderate because the project has a recognized landfill gas methodology, but several key safeguards against over-crediting are missing from the extracted record. No FNRB value or method is available, no usage rate is stated, and leakage treatment is not quantified. CORSIA eligibility and CCP status are also not stated, so downstream claim risk cannot be ruled out.
Documentation
Documentation quality is fair: the evidence set includes monitoring, validation, PDD, and issuance materials, and extraction confidence is high. The project also has a named VVB and a recent monitoring period, which helps. Still, several important fields are absent, and the contradiction about reversal events versus benefit sharing shows that the record is not fully internally consistent.
Overall
I privileged the later validation report for the contradiction on reversal events, because it is more recent than the monitoring report; that means the monitoring record’s statement that reversals were not addressed is not the final word, but the inconsistency still lowers reliability. I also privileged the validation report on benefit sharing for the same reason, since it conflicts with the monitoring report. Overall, the project looks procedurally credible but not especially strong on evidence completeness, and the missing leakage, permanence, and issuance data keep the score in the middle range.
Audit Analysis
This is a landfill gas power project with VVB-confirmed additionality, but the record leaves important gaps on leakage, permanence treatment, and quantified issuance results. The documentation is moderately complete, yet reliability is weakened by contradictions between the monitoring and validation reports on reversal events and benefit sharing.
Project Description
Proponent: Xinning Xinzhongshui Bio-energy Power Generation Co., Ltd. Protocol categories: Energy industries (renewable/non-renewable sources); Waste handling and disposal Protocols: ACM0001 Estimated annual GHG reductions: 37355 tCO2e Region: Asia Registration date: 2025-12-09
Red Flags
- Leakage treatment is not addressed and no leakage deduction is stated in the available monitoring record.
- The documents contradict each other on whether reversal events were reported and whether benefit sharing was described.
Credit Vintages
Nessuna emissione registrata sul registro.
Cosa migliorerebbe questo punteggio
- Provide quantified leakage treatment, buffer pool coverage or other permanence safeguards, and a clear explanation of how non-permanence risk is managed.
- Publish verified and claimed emission reduction totals, plus explicit CORSIA and CCP status, to improve MRV transparency and claim safety.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed additionality test
non-permanence treatment unclear
no leakage treatment stated
project baseline, reassessment timing missing
FPIC and grievance mechanism documented
CORSIA/CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →