Shifosi Solar Cooker Project
GS-2230 ↗ · current registry ID: GS7605
#88of 150 in Cookstoves#775of 1084 in China#1100of 1801 in Gold Standard (GS)#42of 115 in AMS-I.C
Audit Analysis
The Shifosi Solar Cooker Project is a Gold Standard solar thermal cooking project in China with VVB-confirmed additionality and no reversal events, but it is undermined by a project-specific baseline, a 0% leakage deduction, a 10.3% gap between assumed and verified usage rates, and over 30 corrective actions spanning the PDD, monitoring reports, and verification report. Multiple contradictions between documents on leakage treatment, usage monitoring method, and crediting period boundaries reduce confidence in the data record.
Red Flags
- Over 30 corrective actions required across PDD, monitoring reports, and verification report, indicating systemic documentation quality issues
- Usage rate assumed at 100% in the validation report but verified at only 89.7% in the verification report — a 10.3% over-estimation of actual use
- Leakage treatment contradicts between documents: the verification report (2023) states leakage was 'quantified' while the monitoring report (2020) states it was 'not addressed', yet the deduction is 0%
- CORSIA eligibility and CCP status are both unstated, leaving dual-channel risk unassessed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2019 | 102,619 | 100,454 | 2,165 | |
| 2020 | 103,616 | 24,961 | 78,655 | |
| 2021 | 97,482 | 95,821 | 1,661 | |
| 2022 | 97,045 | 95,105 | 1,940 | |
| 2023 | 14,229 | 13,945 | 284 | |
| Total | 414,991 | 330,286 | 84,705 |
Risk Indicators
VVB-confirmed investment test
no reversals reported
0% deduction; contradictory justification across docs
Project-specific; reassessment timing not stated
FPIC, grievance mechanism, and safeguards documented
CORSIA and CCP status both unstated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →